CASE STUDIES

INDUSTRY FLOOR CASE STUDY

Specifications:

  • A coating that would withstand heavy duty traffic from forklifts and vehicles
  • Fully watertight so that it could be easily steam cleaned
  • Non-Slip surface
  • Can be laid at 20% moisture content
  • Will expand and Contract with whatever Substrate Material is applied to
  • Minimal disruption

Solution:

  • Supplied non slip highly durable surface
  • The surface is guaranteed not to Warp or Peel
  • The existing floor was repaired and sprayed directly on top of with no disruption to the factory
  • Water Proof Linings Floor Coating was applied to Cement, Tiles and Steel without the need to remove any of these substrates causing minimal disruption

INDUSTRY FLOOR CASE STUDY INDUSTRY FLOOR CASE STUDY

EQUINE CASE STUDY

Specifications:

  • Stables needed a coating that would last years and retain its look
  • Fully watertight so that it could be easily power hosed cleaned
  • Able to withstand the corrosive effects of urea
  • No joints that bacteria could grow in
  • Easily disinfected after visiting mares
  • Soft finish so kicking animals would not hurt themselves from kicking out

Solution:

  • Supplied a 2 & 3 colour seamless finish that met every requirement
  • The surface is guaranteed no not crack or peel at any stage
  • Sprayed in the exact racing colours Kildangen
  • Water Proof Linings is tough enough that stallions will not damage the surface yet with enough give to protect the horses when kicking out

Equine Case Study Equine Case Study

WATERPROOF PARKING GARAGE

Project task:

  • Repair and waterproof the below grade concrete
  • surfaces with a durable and
  • long-lasting coating

Problem:

  • 20-year-Old 100,000 sqf uncoated concrete parking structure
  • Water would pool on Levels 1 & 2 and leak down to level 3
  • Vital that leaks were repaired and important computers protected from water damage on level 3

Solution & results:

  • All damaged concrete was repaired
  • Primer was then applied to entire area
  • Entire area sprayed with Polyurea Total Waterproofing Solution
  • No Leaks Re-occurred

WATERPROOF PARKING GARAGE WATERPROOF PARKING GARAGE

HARBOUR WALKWAYS

Project Task:

Pedestrian bridges and walkways connect buildings, streets and the harbor’s entertainment and shopping districts due to high traffic, harsh winters and the salt air, many of these walkways are falling into neglect and decay.

Problem:

  • 2,400-square-foot bridge NEVER been coated.
  • Showing heavy signs of wear and decay from years of salt water intrusions and pedestrian use.

Solutions & Results:

  • Thorough surface washing to remove salts from years of deicing
  • Areas of damage or missing concrete were identified and repaired
  • Polyaspartic Base coat was then applied and coloured quatrz added to give both traction and decorative value
  • These restorative and decorative steps taken with this pedestrian bridge provided a large savings over rebuilding a new walkway

HARBOUR WALKWAYS HARBOUR WALKWAYS

BALCONIES

Project tasks

  • Supply a rolled on polyasprtic non slip durable surface
  • Fully watertight balcony
  • Finished surface
  • Seamless finish to minimize issues
  • Minimum down time
  • Polyasprtic coating under

Solutions & Results:

  • Supplied fully waterproof surface
  • Supply a rolled on polyasprtic non slip durable surface
  • Water Proof Linings also matched the colour into the surrounding brick work
  • The surface is guaranteed no not crack or peel at any stage
  • The non-slip floor attractive floor means no need to tile the surface

BALCONIES